This project replaced an existing above ground process and water injection piping system. The project consisted of constructing test stations and running underground piping. This will allow a 50 acre oil field to be developed into a housing track for 550 new homes.
The scope of work included installing underground piping and conduit with cathodic protection in a slurry concrete encased corridor, set test header manifolds and electrical equipment on concrete pads, install lighting and city water at each test station.