|
|
|
|
||||||||||||||||||||||
Photo Gallery
Installing Sluice Gates at UPS
Installing Hobas Pipe at the APS/COP Junction Structure
Setting Transformers at Solids Thickening Building
CEFF Meter Vault Structure
APS Junction Structure
Grouting Future Pump Sole Plate
Screenwall Pour at Electrical Building
110 MGD Motor and Pump
Prep Work on Formed Suction Intake
Force Main Box #1 Pour
Force Main Box #1 at UPS
84 in. CEFF Header Pipe for UPS
Inside Electrical Building Prior to SOG Pour
North View of Unified Pump Station
|
Contact
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |